Project overview
From Oil-Stained Workshop To Working Studio
A stone outbuilding had served as a workshop for forty years. We stripped it to the walls, repaired the joists, insulated and screeded the slab, and laid engineered oak over underfloor heating — a year-round studio in six weeks.
| Detail | Scope |
|---|---|
| Materials | Engineered oak, thermal screed, heating mat |
| Area | 70 m² plus entrance lobby |
| Duration | 6 weeks |
| Service | Construction and Remodeling Services |
Challenge & approach
Forty Years Of Oil Versus A Clean Oak Floor
The old slab was contaminated and 40mm out of level. We ground back the surface, laid a damp-proof membrane, poured a bonded thermal screed, and floated the oak over a low-profile heating mat — warm boards, no radiators stealing wall space.
- Contaminated slab ground, sealed, and re-leveled with thermal screed.
- Underfloor heating mat beneath floating engineered oak.
- Reclaimed boards sanded back for the lobby feature wall.
Project gallery
Details From The Conversion